Los proyectos de regulación de los ríos Júcar y Turia (1928-1964). Una nueva lectura

Authors

  • Juan Bautista Marco Segura

DOI:

https://doi.org/10.7203/CGUV..14207

Abstract

This paper analyses the joint planning process the Jucar and Turia rivers regulation, in order to identify the causes of the most significant technical errors. The planning process started during the Primo de Rivera dictatorship, but the definitive proposals were settled after the Civil War, in 1955, in the Júcar and Turia Regulation Project. These plans, never accepted by local stakeholders and economic agents, completely ignored the potential of groundwater resources and failed in the assessment of water resources, causing the over-dimensioning of some critical infrastructures.

Downloads

Download data is not yet available.

How to Cite

Marco Segura, . J. B. Los proyectos de regulación de los ríos Júcar y Turia (1928-1964). Una nueva lectura. Cuadernos De Geografía De La Universitat De València. https://doi.org/10.7203/CGUV.14207
Metrics
Views/Downloads
  • Abstract
    199
  • PDF (Español)
    296

Issue

Section

Articles

Metrics

Most read articles by the same author(s)